
Stage 05 -Tool Carriage
Easy20 min10 steps
Step 1 Dual Switching Hotend
- Note: If you are building the Dual Switching Hotend complete only steps 7 and 8 of this stage.
Loading comments…
Step 2 Print Fans to Hotend Mount
Loading comments…
Step 3 Mounting the HotEnd

- Thread two M4 x 8mm bolts onto the top of the HotEnd bracket.
- Slide the HotEnd in and clamp it down with the two M4 bolts.
- Keep the this side of the HotEnd parallel with the front of the Hotend Mount
- Make sure that the cables from the Hotend are facing the left side.
Loading comments…
Step 4 Bed Levelling Probe

- Clamp the probe onto the back of the Hotend Mount.
- Keep the bottom of the probe a few millimeters above the tip of the nozzle.
Loading comments…
Step 5 Braided Cable Sleeving Prep.
Loading comments…
Step 6 Braided Cable Sleeving
Loading comments…
Step 7 Braided Cable Sleeving (Dual Extruder Only)

- Note: Cut 1 meter of cable sleeving.
- Melt the ends with a lighter to stop them from fraying.
- Note: Slide the sleeving over the cables from:
- Blower Fan (x2)
- Probe
- Servo Cable (From the Dual Extruder Upgrade box)
- You can also snap on the fan shrouds here too.
- Note: Place this assembly to one side for now.
Loading comments…
Step 8 Y-Carriage Rollers

- Note: Assemble Y-Carriage rollers as shown in the images:
- Four M5 x 25mm bolts
- Two M5 Spacers
- Two Eccentric Spacers
- Four M5 Washers
- Roller Assembly
- Two M5 Nylocs - Tighten Firmly
- Two M5 Nylocs - Tighten Loosely (eccentric spacer should still be able to turn)
Loading comments…
Step 9 HotEnd mount to Y-Carriage
Loading comments…
Step 10 Fan Shrouds
Loading comments…




